From a tired half-bath to a full gut and rebuild. Rough-in, waterproofing, tile, flooring, paint, and finished fixtures, with one crew, one written quote, and no waiting on a string of different subcontractors.
Replacing or relocating supply and drain lines, tub-to-shower conversions, new shower valves, vanity sink and faucet installs, and setting the new toilet. If your home still has old galvanized or cast iron pipe, it can be replaced while the walls are already open, so you’re not tearing into a finished bathroom later.
Properly waterproofed shower pans and walls, wall and floor tile, flooring, vanity and mirror, trim, painting, and the final fixture set. The waterproofing is the part nobody sees and the part that decides whether the job lasts twenty years or five.
A bathroom is the smallest room in the house and the one most likely to be wrecked by cutting corners behind the tile. Keeping the whole job in-house is how we control that.
We look at the space, talk through what you actually want, and give you a full written quote before anything is torn out.
You get a start date and a realistic finish date, and we tell you how long the bathroom will be out of service.
You live here. The site gets swept and contained at the end of every working day.
Whether a permit is needed depends on the township. A cosmetic refresh of paint and hardware may not need one, but work that moves plumbing, changes the drain, adds new electrical, or opens walls often does. When a permit is required, we pull it. The local code office has the final word on what a given job needs.
Yes. A tub-to-shower conversion replaces the tub with a shower in roughly the same footprint and almost always includes a new shower valve, plus a waterproof surround and a properly sloped pan. You can sometimes keep the existing drain if the new base lines up with it. If it does not, or if the subfloor is soft or stained after the tub comes out, the drain or floor has to be repaired or moved before the new pan goes in. We handle the conversion start to finish, including the valve.
A cosmetic refresh is mostly what you can see: paint, hardware, a new faucet, or a new toilet in the same location. A full remodel opens up the plumbing and the waterproofing. It usually includes new rough-in where needed, a properly built shower pan and walls, tile, and flooring. If the drain, valve, or hidden piping is old, a cosmetic job can leave those problems behind new finishes. We can walk through the space and tell you which path fits what you want and what is behind the walls.
Yes, at least the major choices. The shower valve, the tub or shower base, the toilet, and the vanity or sink affect the rough-in dimensions and the drain location. If those items show up late, the job can stall after demolition. After we give you the initial quote, if you’re getting your fixtures through us, we set up a showroom appointment so your selections and the layout match what we plan to install. If you’re supplying your own, send us your fixture list so we can plan the rough-in around it. If a finish selection is still open, we can tell you which decisions have to be locked in before we open the walls.