We don’t just move the sink. Cabinets, tile, flooring, paint, and every bit of plumbing behind the wall, all done in-house by the same crew from start to finish.
Relocating sink and dishwasher lines, running gas for a range, adding a pot filler, ice maker line, or second prep sink, and updating old drain and vent work that no longer meets code. Done by licensed plumbers, because this is the part you never see again once the wall closes.
Cabinet installation, backsplash and floor tile, flooring, trim, and painting, through to setting the faucet, sink, and disposal. One crew carries the job from demolition to the last piece of trim.
Most remodel horror stories are really scheduling stories, with four trades on four calendars and weeks of nothing happening in between. Keeping it in-house is how we avoid that.
We look at the space, talk through what you actually want, and give you a full written quote before anything is torn out.
You get a start date and a realistic finish date, and we tell you how long the kitchen will be out of service.
You live here. The site gets swept and contained at the end of every working day.
Every job is different, but most full kitchen remodels take about a month. A fixture swap is a smaller job than a full gut with new cabinets, flooring, and a moved sink. We give you a start date, a realistic finish date, and tell you how long the kitchen will be out of service before work begins, so you can plan meals and access.
Yes. Moving a sink means moving the drain, the vent, and the water lines, not just the cabinet. The new spot needs a drain that can slope back to the main line and a vent that meets code. On an island, where there’s no wall to run a vent up through, we use an air admittance valve under the cabinet. We plan all of it with the rest of the rough-in before the cabinets go in.
Often yes, if the work adds or relocates plumbing, drain or vent piping, or a gas line. Pennsylvania’s Uniform Construction Code treats that as work that typically needs a permit. Replacing a faucet or appliance in the same spot, with no piping moved, is often considered an ordinary repair and may not. Rules and fees still vary by borough or township, so the local code office has the final word. When a permit is required, we pull it.
Yes, as long as your home already has gas service. It is a common request during a remodel, but it is a gas-line job, not just a new range. The new appliance needs a properly sized supply and an accessible shutoff, and the existing house line has to handle the added load with everything else that may run at once. We run new gas lines to ranges and size the pipe for the total load. When that work needs a permit, we pull it and soap-test the connections before the range goes in.